An iconic building in central Gloucester
Gloucester City Council secured £6.4 million of grant funding from central government through GFirst LEP and Gloucestershire Local Transport Board towards the cost of building the new hub. The project was procured on the County Council framework and Kier delivered this iconic facility on time, on budget and to the complete satisfaction of the client.
Facilities at the new hub include a modern fully enclosed concourse, 12 bus bays, a manned ticket office, electronic timetable displays, café, admin offices and CCTV. Whilst the construction work was carried out, the existing bus station remained fully functioning with existing bus routes and stops unaltered.
Prior to construction significant archaeological surveys took place which identified a Roman wall, parts of which were incorporated as a permanent feature into the build. The colonnade of circular columns also gives a nod to Roman architecture.
Project details:
A wide range of CSR and community activities took place on site including: a construction open-doors event which attracted the most visitors on a site outside of London (53); four work experience students (two on six-week placements); a graduate engineer and degree apprentice QS; the site hosted 15 professionals from the institute of civil engineering; a nurse visit for 15 minute health checks for the team and subcontractors; public access to a time lapse of the build on a community board with a QR code and the project local spend was a significant £2.3m.
Several milestone events were recorded by a very interested local press and media as the project progressed, they included a topping out ceremony, Roman stone laying; Kier’s annual showcase event and an official opening.