Due to the popularity of our last visit, Kier have kindly agreed to host us again to re-visit the A417 Missing Link.
The site visit will include a presentation on the A417 Missing Link, a visitors safety introduction and a walk around the exclusion zone to look at the Gloucestershire Way Crossing.
The A417/A419 provides an important route between Gloucester and Swindon, connecting the North and Midlands to the South of England as an alternative to the M5/M4 route via Bristol.
The Missing Link itself is a three-mile stretch of single-lane carriageway on the A417 between the Brockworth bypass and Cowley roundabout in Gloucestershire. The project will see Kier and its team, Volker Fitzpatrick, Arup, Tony Gee and RPS design and construct 3.4 miles of new dual carriageway.
Details of event:
10:00 – 10:20             Arrive on site, Introductions and refreshments
10:20 – 11:20             Presentation of the A417 Missing Link – Q&A’s
11:20 – 11:30             Visitors Induction
11:30 – 12:00             Exclusion zone for all to look at Gloucestershire Way Crossing build/ photo opportunity
What3words: ///shaped.quietest.payback
Spaces are very limited so book early to avoid disappointment.
PLEASE NOTE A MAXIMUM OF TWO TICKETS PER COMPANY